Chenango Forks Baseball & Softball Fields
Scope of Work:
Erosion control measures
Demo of existing site features; temp fencing, asphalt pavement, concrete walks, existing dugouts, existing scoreboard, existing bleachers, stripping of topsoil
Cut & fill to subgrade
Install 1,704 LF of concrete turf curb
Install baseball backstop tension netting and wall padding
Install softball backstop tension netting and wall padding
Install baseball and softball perimeter chain link fencing
Install baseball and softball chain link windscreen
Install 3,278 TON of gravel blanket
Install 4,060 LF of storm drainage piping
Install 1,089 TON asphalt paving
Install artificial turf on the baseball and softball infields
Install 120,765 sqft of SOD
Install precast concrete dugouts for baseball and softball fields
Install batting cages for baseball and softball fields
Install 160 TON of warning track mix at baseball and softball fields