Liverpool Central School District
Scope of work:
Erosion control measures
Demo of existing site features; fencing, asphalt pavement, clearing and grubbing vegetation
Remove topsoil and screen onsite
Cut & fill to subgrade
Excavate 5,000 CY of earth to create retention area at Morgan Rd Elementary School
Install underground stormwater detention system
Install 1,900 LF of underground stormwater piping
Install new fencing and gates
Install 270 LF granite curbing
Install concrete foundations and structural steel for bleacher addition
Install 8 rows x 138' of bleachers behind the last row of existing bleacher
Install 8' x 30' two story press box with two sets of stairs to upper floor
Install 3 prefab ticket booths
Install 700 ton asphalt paving
Install topsoil, seed & mulch