The Crescent Hotel
Turning Stone Resort & Casino
Scope of work:
· Installed Erosion Control Devices
· Tree Removal and Saw Cut at site location existing asphalt and concrete
· Demo Existing site features; signage, curbing, asphalt pavement and concrete walks
· Remove topsoil; screened on site 1,800 cy
· Cut & fill 9,000 cy to subgrade
· Excavate and Backfill Hotel foundation
· Prep subbase for Hotel Concrete floor
· Installed Utilities
• Underground stormwater drainage with concrete structures
•Sanitary Sewer and Pump Station
•Water line (Fire & Domestic)
• Electric Conduit
· Installed Concrete Site Retaining Wall
• Excavation, Form, Pour and Back Fill
· Installed Granite Curbing
· Installed Concrete Sidewalks
•Prep Subbase, Formed, Poured & Finished
· Installed Asphalt Subbase
· Installed Asphalt
•Base, Binder, Top & Striping
· Topsoil Screened & Installed