The Crescent Hotel

Turning Stone Resort & Casino

Scope of work:

· Installed Erosion Control Devices

· Tree Removal and Saw Cut at site location existing asphalt and concrete

· Demo Existing site features; signage, curbing, asphalt pavement and concrete walks

· Remove topsoil; screened on site 1,800 cy

· Cut & fill 9,000 cy to subgrade

· Excavate and Backfill Hotel foundation

· Prep subbase for Hotel Concrete floor

· Installed Utilities

• Underground stormwater drainage with concrete structures

•Sanitary Sewer and Pump Station

•Water line (Fire & Domestic)

• Electric Conduit

· Installed Concrete Site Retaining Wall

• Excavation, Form, Pour and Back Fill

· Installed Granite Curbing

· Installed Concrete Sidewalks

•Prep Subbase, Formed, Poured & Finished

· Installed Asphalt Subbase

· Installed Asphalt

•Base, Binder, Top & Striping

· Topsoil Screened & Installed

Smith Site Development LLC was selected to partner with Hayner Hoyt, TN Ward and Turning Stone Resort and Casino for the construction of Project Evolution for the complete civil site portion of The Crescent Hotel.