Scope of work:
· Installed Erosion Control Devices
· Demo existing Site Features and Utilities
· Clearing and Grubbing
· Mill Existing Asphalt
· Strip topsoil 14,000 cy
· Cut & fill 85,000 cy to subgrade
· Installed Construction Staging areas
· Imported Structural Fill
· Excavate and Backfill for Utilities
· Steam Lines
· Electric
· Chilled Water
· Reclaim Water
· Water line (Fire & Domestic)
· Sanitary Sewer and Pump Station
· Stormwater drainage and Structures
· Gas Line
· Excavate & Backfill Foundations
· Grand Expo & Parking Garage
· Installed Concrete Site Retaining Wall
· Excavation, Form, Pour and Back Fill
· Installed Asphalt Subbase
· Installed Granite Curbing
· Excavation, Install & Back Fill
· Installed Concrete Sidewalks
· Prep Subbase, Formed, Poured & Finished
· Concrete Grand Expo Entrance Stairs
· Prep Subbase, Formed, Poured & Finished
· Fine Graded Asphalt Subbase
· Installed Asphalt
· Base, Binder, Top & Striping
· Topsoil Screened & Installed
· Strip Roadways and Parking Lots