Newfield Central School District
Scope of work:
Erosion control measures
Demo existing site features; signage, handrails, fencing, playground curbing, concrete curbing, asphalt parking lots
Remove topsoil and screen onsite
Cut & fill to subgrade
Excavate/backfill discovered underground leaking school heating piping
Install underground field and parking lot stormwater drainage - including stormwater pollution separator structures
Repair existing track and install new wearing course and line markings
Install 70 linear feet of boulder retaining wall
Install new flagpoles
Install proper baseball/softball outfield field vertical drainage
Install asphalt and concrete subbase
Restore existing masonry vertical surfaces
Install new handrails at stairs and areaways
Install 3,200 LF of new granite curbing
Install 40,000 sqft of new concrete sidewalk
Install 5,500 ton of new heavy and standard duty asphalt
Install new basketball court with benches, hoops and fencing
Install new tennis court with netting and fencing
Install 3,900 sqft Sod, topsoil, seed & mulch