Smith Site Development LLC was selected by the USPS to prepare for their Utica Region Postal Service area a total of sixty (60) Electric Vehicle Charging Stations. This precise coordinated work required full box out and enlargement of the parking area to provide underground utilities to each charging station as well as connecting concrete sidewalks and employee parking areas. Twelve charging stations were required under the canopy roof area. Each charging station was capable of delivering 35kWh of power.
Scope of Work:
Install Erosion Control
Mill Existing Asphalt 106,894 sf
Box out Parking Lots 5,128 cy
Install Underground Electric 1,280 LF
Install Storm System CB’s & Piping
Form and Pour Concrete
Heavy Duty Transformer Pad
Sidewalks 2,354 sf
Curb 420 LF
Stanchions for EV Stations 30 Total
New Asphalt
Binder 1,350 Tn
Top 1,350 Tn
Crack Fill and Seal Coating 2,354 sf
Striping
Parking Stalls
Handicap Parking Spots
Top Soil
Seed & Straw Mat
Heavy Duty Bollards