Smith Site Development LLC was selected by the USPS to prepare for their Utica Region Postal Service area a total of sixty (60) Electric Vehicle Charging Stations.  This precise coordinated work required full box out and enlargement of the parking area to provide underground utilities to each charging station  as well as connecting concrete sidewalks and employee parking areas. Twelve charging stations were required under the canopy roof area. Each charging station was capable of delivering 35kWh of power.

Scope of Work:

Install Erosion Control

  • Mill Existing Asphalt   106,894 sf

  • Box out Parking Lots   5,128 cy

  • Install Underground Electric  1,280 LF

  • Install Storm System CB’s & Piping

  •  Form and Pour Concrete

    • Heavy Duty Transformer Pad

    • Sidewalks  2,354 sf

    • Curb  420 LF

    • Stanchions for EV Stations  30 Total

New Asphalt

  • Binder   1,350 Tn

  • Top   1,350 Tn

  • Crack Fill and Seal Coating   2,354 sf

  • Striping

    • Parking Stalls

    • Handicap Parking Spots

  • Top Soil

  • Seed & Straw Mat

  • Heavy Duty Bollards