Utica Charging Station EV
Smith Site Development LLC was requested to transform a former Postal Service gathering vehicle parking lot into a larger efficient electrical vehicle charging station. Besides installing to precise electrical standards, a full boxout was required with new underground storm water management systems. Replacing with Heavy Duty Asphalt, specialized electric conduit boxes, and heavy-duty concrete filed steel sleeved bollards. And forming a pouring a electrical generator pad. As well as, including extensive concrete curbing and sidewalks to employee entrances.
Scope of Work:
Install Erosion Control
Mill Existing Asphalt 106,894 sf
Box out Parking Lots 5,128 cy
Install Underground Electric 1,280 LF
Install Storm System CB’s & Piping
Form and Pour Concrete
Heavy Duty Transformer Pad
Sidewalks 2,354 sf
Curb 420 LF
Stanchions for EV Stations 30 Total
Install Erosion Control
Mill Existing Asphalt 106,894 sf
Box out Parking Lots 5,128 cy
Install Underground Electric 1,280 LF
Install Storm System CB’s & Piping
Form and Pour Concrete
Heavy Duty Transformer Pad
Sidewalks 2,354 sf
Curb 420 LF
Stanchions for EV Stations 30 Total