Tompkins County Cold Storage

The new 6,000 sq ft Cold Storage Building preperation sitework included clearing, cut and fill, new 12’ high retaining wall, storm piping, foundation excavation and backfill, interior slab prep, a gravel parking lot, concrete foundation, and interior slab on grade. A 6,000 sq ft pre-engineered metal building.  including metal roof, wall panels, exterior mandoors, and (4) 12x10 overhead doors. Metal stud partitions to divide the building into (2) separate spaces for the maintenance department and soil/water department.  Each space having their own smaller secured and conditioned storge area.

Scope of Work:

  • Installed  Erosion Control, cleared and grubbed  one acre site

  • Level graded a  half-acre site for a 6,000 square foot building

  • Installed and backfilled 200 linear feet of 20’ concrete retaining wall

  • Installed 6,000 sf building perimeter concrete footer & foundation frost wall

  • Installed building subbase material

  • Underground electric and underground drainage installation

  • Coordinated construction of a 6,000 sf metal frame  building with 15’ceilings

  • Coordinated  the install of four 16’ x 12’ overhead doors

  • Fine graded and landscaped